Western Cycle Corridor
The city council received a £6.1m grant from the D2N2 LEP to construct 4 radial routes. This is the first, a mixture of a physically segregated and a shared route.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Pedals (Nottingham Cycling Campaign):
Created by Iain Lane // 1 thread
The city council received a £6.1m grant from the D2N2 LEP to construct 4 radial routes. This is the first, a mixture of a physically segregated and a shared route.
Created by Iain Lane // 2 threads
Dear Consultee,
Nottingham City Council (Radford Road Area, Nottingham) (Prohibitions of Waiting and Parking Places (Specified Classes of Vehicles)) Traffic Regulation Order 2015 (TMP 7115)
Please find attached a consultation letter and associated drawings, SN/TMP7115/01/A, SN/TMP7115/01/B and SN/TMP7115/01/C which relates to the above Radford Road Area, Nottingham – Traffic Regulation Order (TMP 7115).
Created by Iain Lane // 1 thread
Some new lamp posts have been installed on the pedestrian side of this split ped/cycle path. This reduces the effective width of the path and creates conflict.
Created by Iain Lane // 2 threads
I've received some further oral reports that barriers are still in place and that there may be plans to install yet more.
We should investigate and find out what's going on here, stop it happening and have the existing barriers removed.
Created by Iain Lane // 2 threads
This is about creating a pedestrian/cycle area on Station Street between Carrington Street and Trent Street, and a gyratory along the rest of Station Street (up to London Road).
Created by David Lally // 0 threads
The path between Grace Avenue and Mona Street (Part of NCR 6) has had a ramp added for much better cycle access on the Mona Street end and a useful mirror at the other end to be able to see round the corner to and from Grace Avenue. All very good until... this was followed by the fitting of Dismount signs.
Sustrans Rangers are aware of this.
Created by Iain Lane // 2 threads
Press article in the post today: http://www.nottinghampost.com/Major-route-city-centre-overhauled-priority-buses/story-26177322-detail/story.html
Can't find plans just yet.
From email:
Nottingham City Council (Amesbury Circus Area, Aspley, Nottingham) (Prohibitions of Waiting and Entrance Clearway) Traffic Regulation Order 2015 (TMP 7109)
Please find attached a consultation letter and associated Drawings, Numbers TM/TMP7109 which relates to the above areas, Amesbury Circus Area, Aspley , Nottingham - Traffic Regulation Order (TMP 7109). If you have any concerns in relation to the TRO proposals can you please let me have your comments by 31st March 2015.
Created by BrianInBeeston // 0 threads
Proposed route of NCN 15 from Trent bridge to Clifton, following the south bank of the river Trent. The idea under discussion is for the route to be temporarily signed by Sustrans volunteer rangers in the first instance. there are also plans to sign an NCN 15 to NCN6 link route via Wilford Toll, Birdcage walk, Lenton Lane, Abbey St. NCN15 from Clifton westwards to East Midlands parkway station can be signed once the A453 works are complete.
Proposed route of NCN 15 from Trent bridge to Clifton, following the south bank of the river Trent. The idea under discussion is for the route to be temporarily signed by Sustrans volunteer rangers in the first instance. there are also plans to sign an NCN 15 to NCN6 link route via Wilford Toll, Birdcage walk, Lenton Lane, Abbey St. NCN15 from Clifton west can be signed once the A453 works are complete.
Created by BrianInBeeston // 1 thread
Following on from discussions with Ian K, this is the suggested alignment of the link route from NCN 15 to NCN 6 crossing the big track
Preferred route to be signed as an alternative to Chilwell High Road agreed between City, Broxtowe and County Councils.
As discussed between local cycling organisations there is a desperate need for a signed route which avoids Chilwell High Road where there have been a number of accidents now tram tracks are laid in places. This route also avoids Beeston High St which is a lengthy dismount section from 9-5. This route supersedes the previous northerly route. A southern avoiding route has also been plotted on cyclescape
Created by BrianInBeeston // 0 threads
The DfT have contracted consultants to come up with a concept for a north south cycle route broadly following the alignment of the HS2 railway line, but linking up key points of interest and centres of population along the way. For the section from East Midlands Airport to the new station at Toton, a key issue is where the cycle route should cross the Trent. There is a compromise to be made between the shortest route from EMA-Toton and locating the bridge where it would serve the largest population. A more Eastern bridge would serve large population centres in Beeston & Clifton, whereas a more western bridge would be a more direct route. A possible compromise would be to locate the bridge near the existing rail bridges at Trent Junction near Trent Lock.
We aren't aware of plans to replace this particular crossing with a bridge, but it does have the highest risk score of any crossing in the area, so will e on the Network Rail radar.
Created by BrianInBeeston // 0 threads
Following a number of deaths at crossings in this area. This footpath which crosses the midlands mainline is being considered by Network Rail for replacement with a bridge. Unclear at this stage if it will have steps or ramps
www.nottinghampost.com/Plans-new-bridges-railway-crossings-revealed/story-20914367-detail/story.html
Created by BrianInBeeston // 0 threads
Following a number of deaths at this crossing where a footpath crosses the midlands mainline, it being considered by Network Rail for replacement with a bridge. Unclear at this stage if it will have steps or ramps
www.nottinghampost.com/Plans-new-bridges-railway-crossings-revealed/story-20914367-detail/story.html
Created by BrianInBeeston // 0 threads
There has been a surge in use of the station during tram works. Some new users may continue using the station after completion. There is no car park so the village is full of cars. The cycle racks aren't heavily utilised, might be more cycle usage if secure cycle parking were provided.
Created by BrianInBeeston // 0 threads
A white dividing line was put down on University Boulevard in error by the tram contractor. It was not agreed by the City Council.
The white line will be removed. However the cycle path alongside University Boulevard is to be programmed for resurfacing - this will remove the white line and upgrade the surface. This work will be undertaken and paid for by the tram contractor as part of the works they are undertaking to upgrade cycle facilities along the new tram routes.
this path isn't a right of way it has a locked gate.
sketch of route following verbal discussion between Brian & SB.
There will be a walking meeting to look at the route on the 24th April at 11.00 Organised by Hugh McClintock of Pedals.
Created by BrianInBeeston // 1 thread
There have been tacks thrown on the path in this area which cause punctures. Residents have put up signs saying 'no cycling'. This is a defacto bridleway & has been used as such as long as anyone can remember. A local resident has made a witness statement to this effect which is being dealt with by Nottinghamshire County Council rights of way officers.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
I use Scotland road as a lower NOx route. and its easier to join than going on the ring road side of Heathfield primary.
Problem arises from vehicles waiting for the Nottingham Rd & ring road junction at the futurist blocking visibility of the junction. Makes it harder to turn and increases the threat.
Suggested solution: Keep clear markings across the junction.
If agreeable will email KM about it.
Created by Iain Lane // 2 threads
Press article in the post today: http://www.nottinghampost.com/Major-route-city-centre-overhauled-priority-buses/story-26177322-detail/story.html
Can't find plans just yet.
Created by David Lally // 0 threads
The path between Grace Avenue and Mona Street (Part of NCR 6) has had a ramp added for much better cycle access on the Mona Street end and a useful mirror at the other end to be able to see round the corner to and from Grace Avenue. All very good until... this was followed by the fitting of Dismount signs.
Sustrans Rangers are aware of this.
Created by David Lally // 1 thread
Consultation on development in the area of the proposed HS2 East Midlands Hub at Toton. Transport provision with be the County responsibility but it's important that the possibility of cycle route links between the Toton Lane tram terminus (which now has a good quality cycle route to the outskirts of Beeston) and Long Eaton / Route 67 is not compromised.
Created by Hugh McClintock // 1 thread
Comments welcome please on this consultation about barriers on rights of way.
Pedals believes that any kind of barriers should be avoided as far as possible, especially those of the A-frame design. If access controls really are needed they should take the form of bollards (or staggered bollards) rather than barrier.
Message of 22 Feb 2016 from John Lee, Nottm City Council
Morning all
Some of you will recall taking part in its preparation.
We are in the process of reviewing the attached Policy. The policy was in response to complaints about the design of barriers the council have used on rights of way to deal with motorcycles and users safety. Although barriers help deter illegal use some designs were causing problems for disabled citizens, mobility scooters, double buggies and cyclists. When deciding whether a barrier is the best solution for a particular problem/location, the policy has helped provide a consistent approach.
As part of the review do you have any comments on the policy, for example is there anything else the policy should include so the rights of way network is kept free from unnecessary obstructions and is accessible by all? Please forward onto any contacts who may have an interest.
Please could I have your comments by Monday 21st March.
Regards
John Lee
Public Rights of Way
Traffic and Safety
Development and Growth
Nottingham City Council
Loxley House
Station Street
Nottingham
NG2 3NG
Tele: 0115 8765246
Mobile: 07976 794880
www.nottinghamcity.gov.uk/rightsofway
Harmston Rise.
Inadequate drainage.
Any other side road treatments failing already? do they need to be laying drainage kerbing?
Ranty Highwayman has a note on them. Given the flooding that is prone on the ring road probably need to be pushing this with KM for the side roads that will be built to get them spec'd up to include the drainage.